Message boards :
Number crunching :
No New Work again
Message board moderation
Author | Message |
---|---|
Send message Joined: 12 Nov 07 Posts: 2425 Credit: 524,164 RAC: 0 |
Both n-body & MW are out of tasks. Can someone set the new server up to add new runs when the previous run is out? How it was setup before MW crashed some weeks ago. I'm guessing that when it was restored the process wasn't added back, so MW keeps running dry. MW ran good for a while until it crashed and now every couple days it runs out of work. Doesn't expecting the unexpected make the unexpected the expected? If it makes sense, DON'T do it. |
Send message Joined: 8 May 10 Posts: 576 Credit: 15,979,383 RAC: 0 |
Between raising the number of jobs and the time they stay in the database, the total workunit limit was reached and new work stopped getting produced. I've tried that limits a bit. |
©2025 Astroinformatics Group